Engineering Projects

66in PCCP Big Piece Delaminated Mortar

66in PCCP Delamination With Big Crack

66in PCCP With Spalled Concrete Corroded Can

Corrosion Assessment

Corrosion Assessment

Corrosion Pit

Corrosion Pitting Assessment

CP System Install At Dam

Delaminated Coating

Ductile Iron Bonding Across Dresser and Bell

Evaluation of Stray Current Effects on Pipeline

Fitting Damage

Galvanic CP System Install

Light Rail Stray Current Corrosion

Measurement of Corrosion Pit

PCCP Pipe Dig

PCCP Pipe Inspection

PCCP Pipe Inspection

Petroleum Terminal

Pumps on Lake Bottom Protected by CP

Wire from PCCP Pipe